Fabrication
During
an eight week fabrication period, the bridge can finally become
reality. The bridge is 100% student fabricated in our structures lab
(best known as the pit), with students doing all of the welding and
milling.
| We
eat, breathe, and sleep STEEL! |
![]() |
| Ben milling. | ![]() |
| Felipe milling. | ![]() |