Fabrication

During an eight week fabrication period, the bridge can finally become reality. The bridge is 100% student fabricated in our structures lab (best known as the pit), with students doing all of the welding and milling.

We eat, breathe, and sleep
STEEL!
Ben milling.
Felipe milling.